The RI PBI, Rhode Islands' Performance-Based Incentive, can be calculated on Sighten!
...
- Projects with a system size <11 kW are allocated with $0.2965/kwh, applicable for a 15-year term
- Projects with a system size >11kW are allocated with $0.24952345/kwh, applicable for a 20-year term
Info |
---|
Note : Net metering is only applied after the validity period of the incentive. Only after 15 years for systems with system sizes <11kW and 20 years for systems with system sizes >11kW will net metering be applied. |