Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The RI PBI, Rhode Islands' Performance-Based Incentive, can be calculated on Sighten!

...

  • Projects with a system size <11 kW are allocated with $.2845/kwh, applicable for a 15-year term
  • Projects with a system size >11kW are allocated with $.2495/kwh, applicable for a 20-year term


Info

Note : Net metering is only applied after the validity period of the incentive. Only after 15 years for systems with system sizes <11kW and 20 years for systems with system sizes >11kW will net metering be applied.


Still have questions? Contact support@sighten.io or start a chat with us when you are logged into the platform.