...
Finally, the per megawatt rate is ultimately determined by the Block number. A specific system size is allocated for each block. Once the system size is met based on the number of applications Ilinois Illinois has received, they will close the current block and open a new block with a new and relatively lower rate.
Case in point, Illinois is now accepting applications for Block 1 2 for group A and Block 2 for group B for small block categories. Larger block categories are currently closed.
...