Background: Upon initiation of an interconnection request, The utility will transmit the relevant agreement to EverBright. We will then proceed with verifying and obtaining signatures for the Agreement to facilitate the Interconnection process

Each Interaction will be handled via Email through CXone/Sales Force

This process will be handled only by Jessica noriega . and as her backup, it will be Nathan Dubbs

If the Workflow has been cancelled: DO NOT PROCESS THIS INTERCONNECTION

  • Reject it and provide the reasoning note of “Customer’s Job Has been cancelled


Table of Contents

Process

What to do if the Utility is NOT Approved?

Disposition Options

Validation Guide


Process:

Step

Action

Reference

1

  • An Incoming Interaction will come through CXone, Click on “Accept” to continue

image-20240709-130608.png

2

System will open the DocuSign Communication File:

  • Scroll Down until you see the “View Documents” Link and click on it

This will pop up a new window redirecting you to DocuSign

image-20240708-174721.png

3

Once in DocuSign:

  • Click on “I agree to use electronic records and signatures

  • Then click on “Continue

image-20240708-181157.png

4

  • Review the Document and make sure it is coming from an Approved Utility:

  • Encor

  • EverSource

  • Arizona Public Service

  • Trico Electric Cooperative, Inc.

  • The Narragansett Electric Company

  • Massachusetts Electric Company and Nantucket Electric Company (d/b/a National Grid)

  • Unitil

  • Devlin Energy

  • Cherokee County Electric

  • National Grid

image-20240708-182001.png

IF it is NOT an Approved Utility:

If IT IS an Approved Utility:

  • Go to Step 5

5

  • Once you identified that it is an actual Interconnection Agreement with an approved utility; you will Scroll Down to the bottom until you see the “Customer” and “Owner” Box Section

Do Not Sign Yet

image-20240708-182230.png

6

  • We will gather the Homeowner’s information located in that section and then we will locate the customer within Sales Force by typing their Name

If the information is not coming up in Salesforce you can try by locating the Homeowner by Searching in Engine

Take note that sometimes utilities could send the documents under a different name than the one we have in the system

image-20240708-182702.png

7

Are you able to locate the account in our system?

IF NOT

  • Go back to the Email and click on the “Contact Details” Section

  • Select the Disposition “Interconnection-Not Found

  • In “Notes” Add the Homeowner’s Full name as it appears in the Email.

  • Finally Click on “End” and then “Save

image-20240709-130132.png

IF YES

Make Sure that the HO’s Name and State listed in the Interconnection Email Matches the result found in Sales Force

  • Go back to the DocuSign Document and confirm if it has been signed or not.

It should ONLY show Jill Dvareckas or Carey Mendes Signatures

  • If YES: (Go to Step 8)

  • If NOT: (Go to Step 9)

image-20240709-140436.png

8

IF it has been Signed Already then:

image-20240709-135148.png

  • Go back to the Email and click on the “Contact Details” Section

  • Confirm that the “Name” And “Relates To” Fields has been auto-populated , If not complete each box with the Homeowner’s Information.

  • Select the Disposition “Interconnection-Complete

  • Add in “Notes” (Completed and Signed Form)

  • Finally click on “End” and then “Save

9

IF it has NOT been Signed Already then:

image-20240709-141143.png

  • Click on the Yellow Box that says “Sign

  • Then Click on “Adopt and Sign

image-20240709-141413.png

  • Click on “Continue

  • Go back to the Email and click on the “Contact Details” Section

  • Confirm that the “Name” And “Relates To” Fields has been auto-populated , If not complete each box with the Homeowner’s Information.

  • Select the Disposition “Interconnection-Complete

  • Add in “Notes” (Completed and Signed Form)

  • Finally click on “End” and then “Save”

image-20240709-141524.pngimage-20240709-135148.png


What to do if the Utility is NOT approved?:

Step

Action

1

  • Open the DocuSign and download a PDF of the agreement.

2

  • Send an email including the attachment and any other correspondence regarding the utility, agreement, or project to:

  1. Gian.Olano@goeverbright.com,

  2. Paige.Barry@goeverbright.com,

  3. christopher.strain@goeverbright.com, and

  4. Herve.Woods@nexteraenergy.com

  5. CC: rafael.gonzalez@goeverbright.com

  • Request a review and approval within the email

Use the following Naming Convention as the Subject: “Legal Review: Interconnection Agreement - Utility Name / State – Installer(s)”

Please Include in this Email

  • A PDF copy of the Agreement that was submitted

  • The link to the Job

  • A PDF Copy of the customer’s contract

  • The reason for the cancellation, If we have it

  • Any Background regarding the project or Utility

3


Disposition Options:

Disposition

Description

  • Interconnection - Not Found

Unable to locate the Homeowner’s Information or account in the system

  • Interconnection- Complete

Able to locate the Homeowner’s Information or account and Signature has been completed

  • Interconnection Declined

There is an error with the documentation in which we will not proceed with signatures (i.e. EverBright's Name has been spelled incorrectly). See the Validation Guide for Reference.

  • Other

Any other circumstance not listed

  • Closed Duplicate

The agreement attached has been previously resolved already for the same account

  • Requested New Link

If when opening the DocuSign document it says that the link has been expired you will need to receive a new link

(This one will be specially used after a weekend: Usually during weekends utility companies will continue sending Interconnection Emails and by the next business day the link will be most likely expired. Therefore a new link will be required)


Validation Guide:

If any of the following appear in your Interaction it has to be declined. We cannot Sign

Validation

Example

  • Make sure that EverBright's Name spelling is correct

  • Instead of “Everbright” it says “Eberbright

  • There is missing information

  • Instead of “EverBright LLC” it just says “EverBright” without the “LLC”

  • Wrong Information within the wrong category

  • Jill’s Name or Carey’s Name are listed as the “Company Name” instead of “EverBright LLC” as the Company Name

  • Verify that the Job is an Active PPA

  • Everfixed

  • EverFlex

  • EverEasy

  • Sometimes the Job may be under the Co-Applicant’s Name

  • Even if the Interconnection Document shows a name “x” and our system shows a name “y” make sure you are checking the Everbright agreement so to confirm that the correct name “x” is under that same agreement

  • Reject Interconnection if Workflow has been cancelled

  • If the Workflow has been cancelled: DO NOT PROCESS THIS INTERCONNECTION

    • Reject it and provide the reasoning note of “Customer’s Job Has been cancelled

  • No labels