Background: A customer contacts Support and indicates that a mechanical lien has been placed on their home


IF Customer is contacting due to a LGCY Mechanic Lien (Click Here)


Table of Content:


Regular Mechanic Lien:

  • A mechanics Lien is placed on a customer’s home because the work has not been completed at all or was not completed correctly

Refer the customer to their contract to contact their organization If the following criteria is met:

  • If the Suborg/Sales Rep contacts Everbright regarding liens

  • If they are threatening to place a Lien

  • Or If they state they have not been paid

If the Homeowner contacts Everbright stating that they received a preliminary Lien Notice, please refer the homeowner to the CSLB Website (https://www.cslb.ca.gov/consumers/legal_issues_for_consumers/mechanics_lien/How_To_Prevent_A_Mechanics_Lien.aspx#:~:text=The%20simplest%20way%20to%20prevent,contract%20and%20the%20Preliminary%20Notices)

  • Also; Provide the Homeowner with a copy of the CSLB Homeowner’s Guide to preventing Mechanics Liens ( )


LGCY Mechanic Liens

As of January 15, 2025, LGCY has 371 jobs in Illinois that received Mechanics liens from CED due to falling behind on their payments. We are working with them to figure out next steps regarding paying CED and getting the liens removed.

If you receive any of these interactions regarding LGCY ; Let the customer know that we are aware of the situation and we are working with the installer on a plan to remove the Lien as Soon as Possible